Procedure and content of acceptance inspection of mould:
1)Acceptance inspection of mould for the first time:
A. Acceptance inspection of plastic product: Size, No eccentricity, No writing, No pattern, Weight of gram, Appearance quality;
B.Molding process acceptance inspection: Clamping force, Injection pressure, Heater barrel temperature, forming cycle time;
C.Acceptance inspection of mould: Material, Hardness, Size of mould, Marks, Structure.
2)Acceptance inspection of mould for the second time:
A. Weight/Dimensional accuracy/Appearance quality of plastic product;
B. Meanwhile check the testing contents which did not apply to acceptance inspection for the first time;
3)Content of acceptance inspection for the third time:
A.Samples are qualified and confirmed by the Party A(Buyer);
B.Acceptance inspection of Use stability and standards: Continuous stable production more than 1 hour without any faults;
C.Meanwhile check the testing contents which did not apply to acceptance inspection for the second time.